Free Solar Assessment in Quezon City: What to Expect

Free Solar Assessment in Quezon City: What to Expect

What happens before a quote, what to prepare, and what a responsible installer should inspect on site.

Last updated: July 2026 · Quezon City-specific planning guidance. Equipment availability, permitting rules, and prices can change.

Direct answer: the assessment turns a brochure estimate into a site-specific plan

A free solar assessment in Quezon City should connect your Meralco history to your actual roof, shade, electrical panel, access, and goals. The output should be a recommended system-size range, architecture choice, scope assumptions, timeline, price path, and next actions — not a guaranteed savings number based only on a phone call.

What to prepare

  • Recent Meralco bills or kWh history.
  • Barangay and full site address.
  • Roof photos from ground level and, if safe, roof plans.
  • Roof age/material and any planned renovation.
  • Aircon, WFH, EV, pool, pump, or business operating schedule.
  • Brownout frequency and must-run equipment.
  • HOA or landlord constraints if applicable.

What the assessor should inspect

AreaQuestionsOutput
EnergyHow much and when do you consume?kWh and size range
RoofCan it carry and accept mounting?Layout and exclusions
ShadeTrees/buildings/roof furniture?Production adjustment
ElectricalPanel, service, routes, protection?Connection plan
ResilienceWhat must stay on?Battery/critical-load option
ProcessOBO, HOA, Meralco?Timeline and roles

Questions to ask during the visit

  1. What is the recommended kWp and why?
  2. What assumptions drive the savings estimate?
  3. What happens during a brownout?
  4. What is included in permits and Meralco work?
  5. Which parts are excluded or provisional?
  6. Can the design expand to battery, EV, or more panels?
  7. Who handles monitoring and warranty claims?

What happens after assessment

A responsible next step is a written proposal with system size, equipment class, layout, itemized scope, cost, estimated production, exclusions, warranties, and a process timeline. Compare it against the itemized quote guide and size-by-bill guide.

Frequently asked questions

Do I need to know my exact kWp before assessment?

No. Bring the bill and goals; the installer should explain a range and the trade-offs. Your job is to provide accurate inputs, not guess the engineering.

Is a free assessment a commitment?

It should not be. Ask whether there is any design fee, deposit, or cancellation condition before scheduling.

Related guides and services

Get a service recommendation for your site

Tell us whether the project is a home or business, your barangay, recent Meralco bill, roof type, and whether brownout backup matters. Start with our solar services hub, contact page, or the relevant residential / commercial service.