Free Solar Assessment in Quezon City: What to Expect
What happens before a quote, what to prepare, and what a responsible installer should inspect on site.
Last updated: July 2026 · Quezon City-specific planning guidance. Equipment availability, permitting rules, and prices can change.
Direct answer: the assessment turns a brochure estimate into a site-specific plan
A free solar assessment in Quezon City should connect your Meralco history to your actual roof, shade, electrical panel, access, and goals. The output should be a recommended system-size range, architecture choice, scope assumptions, timeline, price path, and next actions — not a guaranteed savings number based only on a phone call.
What to prepare
- Recent Meralco bills or kWh history.
- Barangay and full site address.
- Roof photos from ground level and, if safe, roof plans.
- Roof age/material and any planned renovation.
- Aircon, WFH, EV, pool, pump, or business operating schedule.
- Brownout frequency and must-run equipment.
- HOA or landlord constraints if applicable.
What the assessor should inspect
| Area | Questions | Output |
|---|---|---|
| Energy | How much and when do you consume? | kWh and size range |
| Roof | Can it carry and accept mounting? | Layout and exclusions |
| Shade | Trees/buildings/roof furniture? | Production adjustment |
| Electrical | Panel, service, routes, protection? | Connection plan |
| Resilience | What must stay on? | Battery/critical-load option |
| Process | OBO, HOA, Meralco? | Timeline and roles |
Questions to ask during the visit
- What is the recommended kWp and why?
- What assumptions drive the savings estimate?
- What happens during a brownout?
- What is included in permits and Meralco work?
- Which parts are excluded or provisional?
- Can the design expand to battery, EV, or more panels?
- Who handles monitoring and warranty claims?
What happens after assessment
A responsible next step is a written proposal with system size, equipment class, layout, itemized scope, cost, estimated production, exclusions, warranties, and a process timeline. Compare it against the itemized quote guide and size-by-bill guide.
Frequently asked questions
Do I need to know my exact kWp before assessment?
No. Bring the bill and goals; the installer should explain a range and the trade-offs. Your job is to provide accurate inputs, not guess the engineering.
Is a free assessment a commitment?
It should not be. Ask whether there is any design fee, deposit, or cancellation condition before scheduling.
Related guides and services
- Free assessment / residential service
- Commercial service
- Compare solar quotes
- How to choose an installer
Get a service recommendation for your site
Tell us whether the project is a home or business, your barangay, recent Meralco bill, roof type, and whether brownout backup matters. Start with our solar services hub, contact page, or the relevant residential / commercial service.